Full bathroom renovation
Strip-out to handover: new waterproofing, tiling, plumbing, vanity, screen and lighting.
The small, awkward room off the main bedroom. Less square metreage than a main bathroom, but rarely much less work.
People expect an ensuite to cost half what a main bathroom costs because it is half the size. It rarely does. The same trades attend, the same waterproofing certificate is required, and the same number of set-ups happen. Square metres of tiling is one of the smaller variables in a bathroom quote.
What does change is the design problem. An ensuite is usually long and narrow, opens off a carpeted bedroom, and has to work at six in the morning without waking anyone. Door swing, light placement, exhaust noise and the position of the toilet matter far more here than in a family bathroom.
Typical duration: Three to four weeks on site.

Reconfiguring a cramped plan, often by swapping the shower and vanity or replacing a swing door with a cavity slider.
Getting a clean, level junction between bedroom carpet or timber and the wet-area floor.
Inline or low-noise exhaust so an early shower does not wake the room next door.
A single fixed panel usually reads better and costs less than a framed enclosure in a narrow room.
Full membrane to AS 3740, certified, including the shower and any hob or step.
Layered lighting with a dimmable night level so the ensuite is usable at 5am.
If a quote leaves one of these out, it is not cheaper. It is smaller.
Indicative Sydney ranges for 2026. Your quotes will land where your layout, access and selections put them, which is exactly why three of them are useful.
Compact ensuite, existing footprint, mid-range fixtures.
Relocating the toilet or shower waste in an upstairs ensuite.
Stone tops, full-height large format tiling, custom joinery, heated floor.
Indicative only. Not a quote. Excludes approvals and unforeseen structural repair.
Somewhat, but not proportionally. Expect roughly 15 to 25 percent less than the same specification in a main bathroom, because tiling area is only one part of the cost and every other trade still has to attend.
Sometimes. If the waste and water can stay where they are, the floor below often survives untouched. Moving the toilet almost always means opening the ceiling underneath, so ask for that as a separate line in the quote.
Usually the shower at the far end, the vanity nearest the door, and the toilet between them against the wet wall. It keeps plumbing on one wall and gives you a clear run of floor, which is what makes a narrow room feel usable.
If the budget allows, yes. Doing both at once typically saves 10 to 15 percent against doing them separately, because setup, delivery, waterproofing and tiling all happen once. It also means one disruption instead of two.
Strip-out to handover: new waterproofing, tiling, plumbing, vanity, screen and lighting.
Under four square metres, where every millimetre of layout and every fixture choice matters.
Removing the hob, levelling the floor, linear drainage and a frameless screen.
One brief, up to three licensed renovators, the same scope priced three ways. Free, and you are not committing to anything.
Mon-Fri 8:00-18:00