Full bathroom renovation
Strip-out to handover: new waterproofing, tiling, plumbing, vanity, screen and lighting.
Removing the hob, levelling the floor, running a linear drain and letting the whole room become the shower.
A wet room removes the step, the hob and usually the door. The floor falls gently to a linear drain, one glass panel controls the splash, and the room reads as a single continuous surface. Done well it is the most generous thing you can do to a bathroom without moving a wall.
It is also the job with the least tolerance for sloppy work. Without a hob to contain the water, the membrane and the falls are the only things standing between the shower and the joists. This is not a renovation to award on price alone.
Typical duration: Add roughly one week to a standard bathroom program for the extra screeding and membrane work.

Cutting out the existing shower base or hob and preparing the substrate for a continuous floor.
Screeding the correct fall to a linear or point drain across the wet zone, sometimes recessing the floor frame.
A channel drain along the wall or at the entry, tiled-in or with a stainless grate.
The membrane runs further than in a hobbed shower, often the full floor, and is certified to AS 3740.
A single fixed panel, sized so the splash zone stays where it should.
Floor tiles selected for a wet barefoot area rather than for looks alone.
If a quote leaves one of these out, it is not cheaper. It is smaller.
Indicative Sydney ranges for 2026. Your quotes will land where your layout, access and selections put them, which is exactly why three of them are useful.
Converting an existing hobbed shower within a renovation already underway.
Whole bathroom renovated with a walk-in shower as the centrepiece.
Entire floor treated as the shower, recessed floor frame, feature stone or large format.
Indicative only. Not a quote. Excludes approvals and unforeseen structural repair.
Not if the falls and the glass are right. The floor should fall only within the wet zone, the drain should sit along the wall or at the entry, and the fixed panel should be long enough to catch the spray. Poorly set falls, not the absence of a hob, is what causes water to travel.
Most can, but timber floors need the joists checked and often a recessed floor frame so the finished level stays flush. On a concrete slab it is usually straightforward. A renovator will tell you on the site visit which situation you are in.
In a large room with a long throw from the rose, no. In anything under about 6 square metres, a single fixed panel is worth it. It keeps the vanity and toilet dry without reintroducing a door.
For a walk-in, generally yes. A linear drain needs a fall in one direction only, which makes the floor easier to lay flat with large tiles and easier to walk on. A centre waste needs four falls and forces smaller tiles or complex cuts.
Strip-out to handover: new waterproofing, tiling, plumbing, vanity, screen and lighting.
The small, awkward room off the main bedroom, usually with tight access and a tighter budget.
Under four square metres, where every millimetre of layout and every fixture choice matters.
One brief, up to three licensed renovators, the same scope priced three ways. Free, and you are not committing to anything.
Mon-Fri 8:00-18:00